|
Basic Information |
|
|
Name |
Xi-44 |
|
Launch date: |
21 September 2025 |
|
Rocket description |
- 3”/ 76.2 aluminum airframe (0.035”/0.89mm) - 4 fins, 2024 aluminum (0.065”/1.65mm) - 3D printed PLA tangent-ogive nosecone - 3D printed PLA boattail fairing/motor retainer - 3D printed PLA aft-mid body coupler - 3D printed PLA aft smoke system support - 3D printed PLA NFB - 42 inch ellipsoidal "Fruity Chutes" parachute |
|
Payload |
- Blue Raven flight computer (primary role) - Blue
Raven flight computer for backup apogee separation - BRB900 GPS transmitter - Apogee-activated smoke tracker with Legendary formulation. - SJCAM C100 on-board video camera - Pair of Pyro Separation Device (PRD) to release chute tethers post-landing |
|
Liftoff mass |
3.195 kg. |
|
Stability Margin (minimum) |
2.68 |
|
Flight objectives |
- Test flight of repaired Quark altimeter - Third flight equipped with PRD/timer units |
|
Motor details |
|
|
Motor name |
APM-E14.3
(38mm) |
|
Propellant |
AXP-AP4.7 (Ammonium Perchlorate 65.8% /Epoxy (New Classic) 24%/Aluminum 10% /Lampblack 0.2%) |
|
Grain mass |
342 grams |
|
Delivered Impulse |
697 N-sec. (est.) |
|
Class |
J |
|
Additional
information |
|
- Quark was repaired by replacing a driver chip. It was discovered during replacement that the problem was not a faulty chip, but a faulty solder joint connecting one of the chip legs to the circuit board. I had failed to detect this “hidden” flaw despite careful post-soldering inspection during assembly of the Quark. - 3D printed PLA coupler, fractured during previous flight, was replaced with a machined aluminum coupler. - The purpose of the PRD (Pyrotechnic Release Device) units is to release the parachute from the rocket after a preselected time delay following launch. This will be a third proving flight for the two units. |
|
Weather conditions |
|
|
Temperature |
19°C (66°F) |
|
Wind |
S ~5 km/hr (ground level) |
|
Sky |
Broken clouds |
|
Other |
Very damp due to recent rains |
|
Ceiling |
10k ft. |
|
Launch Event
Description |
|
Trek to the launch site proved rather taxing, as the ground was more wet than expected due to recent rains. Clay-rich mud clung tenaciously to the wagon wheels and to our boots. Once we arrived at the launch site, setup of the launch pad and rocket, using our checklist, went smoothly for the most part. One glitch was encountered. Raven unit #2 went into the data download mode upon startup, even though the data had been downloaded earlier. This same quirk happened earlier during pre-flight setup. The BRB transmitter was then activated, then the nosecone PRD timer was activated. The Quark was powered up and confirmed ‘ready for launch’ by its chirping. The AvBay PRD timer was then activated, and last of all, the on-board camera was powered up and set to record. As usual, for filming the flight, I used my Sony HDR-CX240 Handycam fitted with scope tube. We headed to where the Launch Firing control was located, 275 feet south of the pad. After verifying the sky was clear, the countdown proceeded. At the zero mark, the ignition button was pressed. A second later, the rocket soared skyward with a loud roar and bright flame. The roar seemed more loud than usual, likely due to the near-absence of wind. The motor burned for an estimated two seconds. We lost sight of the rocket after burnout. Although we scanned the sky, we could not locate any smoke trail. Roughly 15 seconds after liftoff, we heard a faint ‘pop’ sound of the apogee pyro firing. We were unable to spot any smoke trail of the descending rocket, likely due to the broken clouds overhead. About a minute later, we heard the ‘pop’ sound of the parachute deployment pyro. I spotted the parachute shortly afterward, with the rocket drifting slowly downward, carried by the wind to the north-east of us, estimated to be around 500 feet away. Rocket drifted slowly earthward and touched down on an embankment to our right, estimated to be 1000 feet away. We programmed the GPS coordinates received from the BRB transmitter into the hand-held Garmin GPS unit. Indicated distance was 367 metres (1200 ft.). It was a straightforward hike to retrieve the rocket, which was found within 7 metres of the indicated landing site. The rocket looked to be in great shape, with all components present. The Quark beeped out an apogee of 4498 feet. We noticed neither PRD had yet fired, however, this was expected as we’d reached the touchdown site prior to the 30 and 40 minute delay periods the two PRDs had been set to. As we were walking back to the launch site, the AvBay PRD fired, releasing the tether link. After we arrived, the nose PRD likewise fired, operating nominally. |
|
Flight Analysis |
|||
|
Event: |
Time (sec) |
feet |
metres |
|
Apogee* |
17.1 |
4636 |
1413 |
|
Chute deployment |
68.2 |
699 |
213 |
|
Touchdown |
107 |
- |
- |
|
Range |
- |
984 |
300 |
|
Max. velocity |
639 fps |
195 m/sec. |
mach 0.60 |
|
Descent rates: |
ft./sec. |
m/sec. |
|
|
Free-fall |
77.0 |
23.5 |
|
|
Parachute |
15.9 |
4.85 |
|
* Corrected
for non-standard base temperature of 29°C.
|
Post-flight analysis and comments: |
|
Both Blue Ravens performed well, reporting apogees of 4548 and 4550
feet. The Eggtimer Quark reported apogee of 4498 feet (reported altitudes not
corrected for base temperature). Operation of the BRB (GPS) unit was fully
nominal. GPS-based apogee was 4646 feet (1416m.), which is within 0.2% of the
temperature-corrected Raven apogee. Maximum reported acceleration of the
rocket during motor burn was 15.2G’s. The operation of the Quark altimeter was fully nominal,
validating the repair that had been done to it following the previous flight. Examination of the Raven axial acceleration data indicated that
the APM-E14.3 motor had a fully nominal
burn that matched static test results. Burn time was 2.0 seconds. Both PRD/timer units functioned nominally, releasing the
parachute tethers after the expected delay periods. The smoke charge ignited and fully burned. |
Misc photos:
Propellant grain segments Xi-44\DSCF7986.JPG
New coupler Xi-44\coupler.jpg
Blue Raven:
Barometric altitude plot Xi-44\Xi-44-Raven1-alt.jpg
Axial acceleration plot Xi-44\Xi-44-Raven1-accel.jpg
Launch photos:
Rocket on pad Xi-44\DSCN0818.JPG
Ignition…! Xi-44\2025-12-02_08-19-20.jpg
Liftoff…. Xi-44\2025-12-02_08-20-41.jpg
Accelerating skyward Xi-44\2025-12-02_08-21-06.jpg
Burnout Xi-44\2025-12-02_08-22-25.jpg
Coasting toward apogee Xi-44\2025-12-02_08-23-26.jpg
Free-falling, view from on-board Xi-44\2025-12-02_09-01-12.jpg
Smoke train, view from on-board Xi-44\2025-12-02_09-02-55.jpg
Parachute deploys Xi-44\2025-12-02_08-26-22.jpg
Descending gently by parachute Xi-44\2025-12-02_08-27-50.jpg
Nearing touchdown Xi-44\2025-12-02_08-33-26.jpg
Landing site Xi-44\2025-12-02_08-52-23.jpg
Parachute Xi-44\2025-12-02_08-53-58.jpg
Fwd section Xi-44\2025-12-02_08-54-20.jpg
NFB Xi-44\2025-12-02_08-54-46.jpg
AvBay Xi-44\2025-12-02_08-55-11.jpg
Aft section Xi-44\2025-12-02_08-55-47.jpg