|
Basic
Information |
|
|
Name |
Xi-23 |
|
Launch date: |
20 March 2021 |
|
Rocket description |
- 76.2/63.5mm aluminum airframe - 4 fins, 2024 aluminum - 3D printed conical PLA nosecone - 3 ft. ellipsoidal "Fruity Chutes" parachute |
|
Payload |
- Raven3 altimeter (primary role) - Eggtimer Classic altimeter for backup apogee separation and backup main deploy - BREO-N flight computer (2nd backup, apogee only) - BRB900 GPS transmitter - Lift-off activated smoke tracker with Legendary formulation - SQ11 micro-camcorder, aft-facing |
|
Liftoff mass |
3.238 kg. |
|
Stability Margin (minimum) |
2.09 |
|
Flight objectives |
- Flight test of commercial Loki 54 motor powered KNSB propellant -2nd attempt of new hi-resolution micro-camcorder -Test effectiveness of lift-off activated smoke tracker to aid tracking under grey sky conditions |
|
Motor
details |
|
|
Motor name |
Loki 54 |
|
Propellant |
KNSB (coarse oxidizer) |
|
Grain mass |
381 grams |
|
Nominal impulse |
436 N-sec. |
|
Class |
I |
|
Additional
information |
|
- Loki 54(/950) is a commerically made rocket motor manufactured by Loki Research LLC. The motor was donated by Scott Kormeier and came with a #16 throat (0.25 inch). For this rather small throat, I had to use coarse ground oxidizer version of KNSB, rather than the fine-ground version that I always use in my own motors. Three BATES segments were employed. The only modification to the motor was replacement of the (rather heavy) static test bulkhead with a lightweight bulkhead that I machined from 2024 aluminum alloy. The original bulkhead has a mass of 86 grams, the new bulkhead has a mass of 23 grams. As such, the Loki motor had a fully-loaded mass of 880 grams. This motor was static test fired twice, once with a partial propellant load, once with a full load. Performance met expectation. |
|
Weather
conditions |
|
|
Temperature |
14°C (57°F) |
|
Wind |
S 25 km/hr gusting to 45 km/hr |
|
Sky |
Partial sun with grey sky overhead |
|
Other |
- |
|
Ceiling |
10k ft. |
|
Launch
Event Description |
|
The wind was particularly strong this day, with gusts up to 45 km/hr. We’d previously launched under such conditions so we were reasonably confident that the rocket flight would not be adversely affected. As the ground snow cover disappeared early this Spring, we used our launch-wagon to haul the supplies to the launch site. Following our checklist, we proceeded to set up the rocket. Setup went well with no glitches. The BRB transmitter and receiver were activated and verified that a good GPS signal was obtained. The BREO was activated and verified to be functioning, followed by the EggTimer unit and Raven. Raven beeped out codes indicating nine volts battery power and two active pyros. The SQ11 camcorder was then powered up and installed in the rocket. The lift-off activated smoke charge was then powered. For videotaping the flight, I used the hand-held Sony camcorder fitted with scope tube. After verifying the sky was clear, the countdown proceeded. At the zero mark, the ignition button was pressed, however, th igniter failed to fire. After waiting several minutes for safety, we approached the rocket and attempted to diagnose the problem. Everything seemed in order. We nevertheless swapped out the igniter for a fresh one. We once again attempted to launch the rocket, and this time, the igniter fired and the rocket immediately lifted off, briskly accelerating skyward. After climbing a short distance, the rocket apparently caught a gust of wind, as it veered briefly to the right, then straightened out to attain a vertical climb. As the rocket ascended, the rocket began to weathercock, as expected due to the strong wind. Burn time of the motor was approximately two seconds. We lost sight of the rocket following burnout. Due to the grey sky, we did not spot any smoke trail nor smoke clouds from the apogee pyro charges. We did hear the ‘pop’ sound of the apogee charge after around 20 seconds. A half-minute later a loud ‘pop’ sound of the chute pyro charge was heard. We immediately spotted the rocket to our right, the parachute fully blossomed, and the rocket drifting with the wind. The rocket was seen to ‘gyrate’ as it descended due to the wind. Touchdown occurred approximately a half-minute later, at an estimated range of 1000 feet. We programmed the GPS coordinates into the handheld Garmin unit. Indicated distance to touchdown site was 0.24 miles (0.4 km). Arriving at the touchdown site, all the rocket components were seen to be present. The rocket appeared to be in pristine condition. Raven beeped out an apogee of 2161 feet. A quick check indicated that all pyro charges had fired, as well as the smoke charge. |
|
Flight
Analysis |
|||
|
Event: |
Time (sec) |
feet* |
metres* |
|
Apogee |
12.0 |
2163 |
659 |
|
Separation |
12.8 |
2152 |
656 |
|
Main deployment |
33 |
792 |
241 |
|
Touchdown |
65 |
- |
- |
|
Range |
- |
1095 |
334 |
|
Descent rates: |
ft./sec. |
m/sec. |
|
|
Free-fall |
71.8 |
21.8 |
|
|
Main parachute |
22.4 |
6.8 |
|
* Corrected for
non-standard base temperature
|
Post-flight analysis and comments: |
|
Post-flight examination of the rocket and data indicated that the operation of the Raven, EggTimer and BREO was fully nominal. The Raven, EggTimer and BREO each gave apogee readings within 0.7%. The BRB GPS data indicated an apogee of 2181 feet, which is within 1% of the Raven apogee of 2163 feet. Based on the apogee and the shape of the Raven acceleration curve, the Loki rocket motor performed as expected. The shape of the acceleration curve matched the pressure-thrust curve from the static tests. Tear-down of the motor showed it to be in pristine shape. The phenolic casing thermal liner and all casting tubes were largely intact. The lift-off activated smoke charge functioned as designed. However, the grey sky prevented the grey smoke trail from being seen. A black smoke charge is currently under development, which will hopefully be more visible under such a condition. Once again the SQ11 micro-camcorder stopped recording shortly after rocket was placed on the launch pad. Clearly this camera is defective. A new, more expensive and hopefully more reliable camera was recently purchased and will be flown in a future flight. |
Raven data:
Barometric and axial acceleration data Xi-23\Xi-23_Raven_basic.jpg
Acceleration curve, boost phase Xi-23\Xi-23_Raven_accel.jpg
Eggtimer data:
Altitude versus flight time Xi-23\Xi-23_ET.gif
BREO data: Xi-23\Xi-23_BREO.gif
BRB GPS data:
Plot of flight path over terrain Xi-23\Xi-23_BRB_mapped.jpg
Miscellaneous photos:
Loki rocket motor Xi-23\motor.jpg
Original bulkhead and lightweight bulkhead Xi-23\DSCF6563.JPG
Lightweight bulkhead installed Xi-23\DSCF6566.JPG
Grain casting apparatus Xi-23\Dscf6487a.jpg
Curing propellant under pressure Xi-23\DSCF6492.JPG
KNSB propellant grain segments (primed) Xi-23\DSCF6561.JPG
Launch photos:
Rocket on the pad with my brother Blair Xi-23\BN_with_Xi-23_rocket.JPG
Author with Xi-23 rocket Xi-23\DSCN0563a.JPG
Ignition… Xi-23\2021-03-24_16-09-37.jpg
Liftoff…! Xi-23\2021-03-24_16-10-04.jpg
Gust of wind causes rocket to briefly veer… Xi-23\2021-03-24_16-11-20.jpg
…then straightens out to vertical Xi-23\2021-03-24_16-11-54.jpg
Black puff of smoke from Smoke charge ignition Xi-23\2021-03-24_16-12-09.jpg
Burnout Xi-23\2021-03-24_16-12-55.jpg
Parachute fully blossomed Xi-23\2021-03-24_16-14-07.jpg
Backup pyro fires Xi-23\2021-03-24_16-14-36.jpg
Rocket descends, gyrating due to gusty wind Xi-23\2021-03-24_16-14-54.jpg
Nearly on the ground Xi-23\2021-03-24_16-23-19.jpg
Touchdown site Xi-23\DSCN0564.JPG
Video:
Launch video (Youtube) coming soon